MIL-DTL-3060G (AR)
4.3.2.2
DRAWING
Functioning/Airtightness/Gasket Compression/Coating/Weld Security
NUMBER
7553296/7553315
NEXT HIGHER
ASSEMBLY
Examination or Test
Conformance
Requirement
Inspection
Classification
Criteria
Paragraph
Method
Critical
None Defined.
Major
101
100% 1/
Airtightness
3.5
Visual/Manual
VL IV
102
Gasket compression
3.7
AIE
Functioning
Cover assembly
13 2/
103
3.4.1
Manual
13 2/
Hasp and latch
104
3.4.2
Manual
32 2/
Elevated temperature
105
3.4.3
Manual
3 3/
Paint thickness and adhesion
106
3.3.1
4.4.1
3 3/
Corrosion resistance
107
3.3.2
4.4.2, 4.4.2.1
Weld security
13
2/
Cover handle assembly
108
3.6.1
AIE
13
2/
Latch, cover, and hinge assembly (M19A1)
109
3.6.2
AIE
2/
13
Cover hinge assembly (M2A1)
110
3.6.3
AIE
13
2/
Hasp Assembly
111
3.6.4
AIE
Minor
None defined
NOTES:
1/ Any box assembly which fails to meet the specific requirements shall be removed from the lot. These defective box
assemblies may be reworked and resubmitted for retesting.
2 Failure of one or more sample unit to comply with the specified requirements shall be cause for rejection of the lot.
3/ Failure of any box to confirm to the requirement shall be cause to require the manufacturer to correct his painting
process to comply with the requirement.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business