MIL-DTL-3060G (AR)
4.2.1 First article quantity. The first article sample shall consist of thirty (30) painted boxes and two
(2) complete sets of unassembled component parts
4.2.2 First article rejection. If any item of the sample fails to comply with the first article
requirements, the first article shall be rejected.
TABLE II. First article inspection
Conformance
Requirement
Examination or Test
Inspection Method
Criteria
Paragraph
Assembly
15
3.2
4.3.2.1
(Dwg. 7553296 or 7553315, as applicable)
Examination for defects
3
3.3
4.4.1, 4.4.2, 4.4.2.1
Protective Coating 2/
15
3.4
4.4.3
Functioning
30
3.5
4.4.4
Air Tightness of box assembly
Gasket Compression
10
3.7.1
4.4.6, 4.4.6.1, 4.4.6.3, 4.4.6.4
M19A1 (Dwg. 7553315)
10
3.7.2
4.4.6, 4.4.6.2, 4.4.6.3, 4.4.6.4
M2A1 (Dwg. 7553296 )
Weld Security 1/
3.6.1
5
4.4.5.1
Cover handle assembly
Latch, cover and hinge assembly
3.6.2
5
4.4.5.2
(Applicable to M19A1 box)
Cover hinge assembly
3.6.3
5
4.4.5.3
(Applicable to M2A1 box)
3.6.4
5
Hasp assembly
4.4.5.4
NOTES: 1/ The weld security inspections shall be performed after the other inspections have been performed
on the samples.
2/ For boxes coated in accordance with 12998172, an additional corrosion resistance test will be
performed on three (3) 4 X 6 inch panels in accordance with 4.4.2.2.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business