MIL-DTL-2427H (AR)
6.6 Sources. One source of satisfactory type of knurled or screw type wire with
driving equipment is Auto-nailer Company, 267 Mariette N.W., Atlanta, Ga.
6.7 PQ-56. For the 1.8 percent copper-8-quinolinolate solution, may be obtained
from the Chapman Chemical Company, P.O. Box 9158, Memphis, Tn 38019 or
equivalent facility.
6.7.1 Alternate method.
6.7.1.1 Materials and equipment. The material and equipment required are as
follows:
a. Reagent. Dissolve 0.5 grams chrome azurol "S" concentrate (see 6.11) and
5.0 grams sodium acetate in 80 ml of distilled water and then dilute further to 500 ml
total with distilled water.
b. Sprayer. A common manual (fly) sprayer type applicator should be used.
6.7.1.2 Test procedure. Spray solution over surface of dried wood. A deep blue
color reveals the presence of copper (from the copper-8- quinolinolate).
6.8 M-GARD W550 (zinc hydronap) For the 3 percent zinc as metal solution,
may be obtained from the Mooney Chemicals Inc., 2301 Scranton Road, Cleveland, Ohio
44113-9988 or equivalent facility.
6.9. Inspection equipment design. Design responsibility for inspection equipment
is assigned to the contractor.
6.9.1 Contractor designs. Contractor designs are required for all inspection
equipment and may include commercial equipment which the contractor proposes to use.
(Commercial equipment is defined as unmodified equipment which is cataloged and
available for purchase by the general public). Contractor designs should include
appropriate operating instructions, calibration procedures and maintenance procedures.
Commercial equipment should be fully described by catalog listings or other means
which provide sufficient information to permit identification and evaluation by the
Government and may include illustrations and engineering data. Designs should be
prepared for any special fixture(s) required to be used with commercial equipment.
Designs should be of the category and form (per MIL-D-1000) specified in the Contract
Data Requirements Lists (DD Form 1423). The item detail specification number,
paragraph number, and defect number form Section 4 should be referenced on each
contractor design together with the component or assembly drawing number, revision
letter and date to which the specific design applies.
6.9.2 Submission of designs for approval. Contractor designs should be approved
by the Government prior to fabricating or procuring the equipment. Designs should be
- 32 -