MIL-C-81084A(OS)
a.
Container not complete; component parts missing
b.
Component parts not new; evidence of reclaimed, used, or salvaged components
c.
Evidence of use of unauthorized repairs
d.
Shock mounts not correctly installed
e.
Rubber surfaces of saddles and straps missing, damaged, or deteriorated
f.
Evidence of shock mount deterioration
g.
Use of unauthorized materials
h.
Evidence of substandard weld procedures
i.
Loose mechanical connections
j.
Paint damaged or coverage not complete
k.
Identification plate and markings not attached or not located as specified; not legible; data
incomplete
l. Packing not as specified in section 5
5. PACKAGING
5.1 Preservation and packaging. Not applicable.
5.2 Packing.
5.2.1 Level A. Not applicable.
5.2.2 Level B. Not applicable.
5.2.3 Level C or industrial. Cleaning, drying, preservation, and packaging shall be accomplished in
accordance with the contractor's own commercial practice when such practices have been approved by the
contracting activity (see 6.5.3 and 6.5.4).
5.3 Marking. Unless otherwise specified, labeling and marking of all shipments shall be in accordance
with MlL-STD-129. Any special marking required by the contract or order shall be provided. Marking shall
be applied only to the packing material, as specified. Carload or truckload shipments do not require marking.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not
mandatory.)
6.1 Intended use. The container is intended as a reusable container for use in both foreign and domestic
shipment and indeterminate storage of one Torpedo Main Assembly Mk 46 Mod 0, or one Propellant Actuated
Gas Pressure Generator, Mk 8 Mod 0, loaded or unloaded.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of the specification
b. Issue of DoDISS to be sited in the solicitation, and if required, the specific issue of individual
documents referenced (see 2.1.1, 2.1.2 and 2.2)
c. Requirements from associated detail specifications (see 3.1)
d. Whether a first article inspection is required (see 3.2)
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business