MIL-C-81084A(OS)
a. First article inspection
(1) First article sample (see 4.3.1)
(2) First article tests (see 4.5)
b. Periodic production inspection
(1) Periodic production sampling (see 4.3.2)
(2) Periodic production tests (see 4.6)
c. Acceptance inspection
(1) Acceptance sampling (4.3.3)
(2) Acceptance tests and examinations (see 4.7)
4.3 Sampling.
4.3.1 First article sample. A first article sample of one container manufactured in accordance with 3.3,
shall be subjected to the first article tests detailed in 4.5 at a facility designated by the contracting activity.
Acceptance of the first article sample shall be based on no defects in the sample. Further production of the
container by the contractor, prior to approval of the first article sample, shall be at the contractor's risk.
4.3.2 Periodic production sampling. Periodic production tests detailed in 4.6 shall be performed at a
facility designated by the procuring activity. Samples shall consist of units that have satisfactorily passed the
acceptance tests and examinations detailed in 4.7, selected as follows:
a. Step 1. Upon initiation of production, randomly select 1 unit from each group of 10 units. Upon
satisfactory compliance of samples selected from 3 consecutive groups, proceed to step 2.
b. Step 2. Randomly select 1 unit from each group of 25 units. Upon satisfactory compliance of
samples selected from 3 consecutive groups, proceed to step 3.
c. Step 3. Randomly select 1 unit from each group of 50 units. Continue with step 3 for the balance
of the contract or until a defective unit is found.
4.3.2.1 Defective units. When a defective unit is found in any group the supplier shall:
a. Determine the cause of the defect
b. Determine if the defect is an isolated case
c. Take the necessary action to eliminate the defects from units on hand and, if directed by the
contracting activity, from those units previously shipped.
d. Submit to the procuring activity for approval, the proposed corrective action to prevent recurrence
of the defect.
e. Return to step 1 (4.3.2a) and proceed as indicated for inspection of units subsequently produced.
4.3.3 Acceptance sampling. The tests and examinations detailed in 4.7 shall be conducted on each
container to be delivered; therefore, there shall be no sampling plan for acceptance. Defective units shall be
rejected.
5